-Back to Projects

Roosevelt C. Sands Jr. Housing Complex, Phase I, Key West, FL

Affordable Housing (Phase I and II complete, Phase III under way)
5-Acre Site
9 two-story multi-unit buildings and 1 one-story common building, built in three phases
44 apartment unitslouboutin shoes
red bottom shoes
nike pas cher
1, 2 and 3 bedroom floorplans
2 trash enclosures
Structure:  Wood-framed walls, concrete footings on augercast piles; pre-engineered
wood floor and roof truss systems, metal roof system, FibreCement exterior lap siding,
drywall interior finish.
Complete MEP system.
Sitework includes demolition of existing structures with asbestos abatement, on- and off-site improvements including
associated roadways, utility infrastructure and creating a buildable site, which includes new water,
sanitary sewer and stormwater lines, as well as parking areas.
Government Funding:
   Tax Credit program
   City of Key West